Nahma Road Bridge Replacement

Completed Nahma Road bridge replacement over a small watercourse.

Project Overview

Project Description

TULLOCH was retained by the Town of Cochrane to design a replacement bridge on Nahma Road at the south end of the community.

The replacement structure included cast-in-place shallow concrete foundations and abutments with a prefabricated steel superstructure. TULLOCH provided engineering and technical services from investigation and design through construction, including structural, civil, geotechnical, environmental, surveying, inspection, and contract administration.

Scope of Services

  • Structural design of the replacement bridge
  • Civil design
  • Geotechnical investigation and foundation design
  • Environmental permitting
  • Topographic survey
  • Construction layout
  • Construction inspection
  • Contract administration

Discuss Your Bridge Project

Planning a bridge project? Contact our Timmins team to discuss your site, technical requirements and next steps.

Find an Office

Connect with a team that knows your region.