Lake Superior Link Transmission Line

Project Overview
Location: Thunder Bay, ON
Client: SNC-Lavalin
Services: Engineering, Civil Engineering, Environmental, Geomatics, GIS
Sector: Energy
Project Description
The Lake Superior Link Transmission Line is described as a 430 km transmission project between Wawa and Thunder Bay. Construction access through remote terrain required planning for corridor access, crane access for large tower erection, local access roads for smaller equipment, and laydown or fly-yard locations.
TULLOCH supported SNC-Lavalin with right-of-way and permanent-access-road planning and civil design. Field reviews assessed existing and potential roads and trails, while deliverables documented required upgrades, watercourse crossings, and preliminary access layouts supported by GIS mapping.
Scope of Services
- Civil access-road planning and preliminary design
- Field assessment of existing and potential construction access roads and trails
- Site proofing using all-terrain vehicles in difficult terrain
- Access-road upgrade and watercourse-crossing recommendations
- Preliminary drawings supported by GIS mapping

Solutions in Action
Related Transmission Projects

Featured Projects
Transmission Line Environmental Portfolio
TULLOCH has supported various clients for Hydro One projects, delivering comprehensive environmental, mapping, and GIS services for thousands of kilometres of new and existing transmission corridors across northern Ontario.


Discuss Your Transmission Project
Planning a transmission project? Contact our Thunder Bay team to discuss your site, technical requirements and next steps.