Forty Mile Wind

Project Overview
Location: Bow Island, AB
Client: RES Group
Services: Geomatics, Land Surveying, Geospatial & LiDAR, Geomatics Engineering
Sector: Energy
Project Description
The Forty Mile Wind Energy Project is a 400 MW wind development near Bow Island, Alberta. TULLOCH provided geomatics and engineering services to establish reliable site information, define property and utility constraints, and support project design, land requirements, construction planning, and turbine component delivery.
Our work included control network establishment, LiDAR and aerial imagery, topographic mapping, legal boundary retracement, buried utility investigations, and preparation of engineering base plans, crossing exhibits, land conveyance drawings, and construction drawings.
TULLOCH also completed site and transportation route inspections to help identify access constraints and support the safe, efficient movement of wind turbine components and heavy equipment to the project site.
Scope of Services
- Site control network establishment
- LiDAR, aerial imagery, and topographic feature identification
- Legal boundary retracement and buried utility investigations
- Engineering base plan development
- Crossing exhibits
- Land conveyance drawings
- Construction drawings
- Site and transportation route inspections
- Route assessment for turbine component and equipment delivery

Solutions in Action
Related Wind Energy Projects

Featured Projects
Lanfine Wind
TULLOCH provided surveying, mapping, utility investigations, and land documentation for the approximately 150 MW Lanfine Wind project, supporting design, land acquisition, and construction.


Discuss Your Wind Energy Project
Planning a wind energy project? Contact our Calgary team to discuss your site, technical requirements and next steps.
