Coke Screening Tower Pier Repair

Project Overview
Services: Engineering, Structural Engineering, Heavy Industry Engineering
Sector: Industrial & Manufacturing
Project Description
A major steel manufacturer identified significant erosion and deterioration affecting the steel and concrete piers supporting a coke screening tower. The condition required a repair strategy that could restore structural integrity while maintaining the continued functionality of the surrounding industrial operations.
TULLOCH assessed the damaged piers, documented the extent of deterioration, and developed repair and reinforcement designs suited to the existing structure. The work also included the design of a temporary jacking frame to safely support the piers during repair activities, along with erosion protection measures to reduce the risk of future damage.
TULLOCH remained involved during construction through field reviews to verify that the repairs were installed in accordance with the design intent.
Scope of Services
- Structural inspections of steel and concrete piers
- Condition reporting and documentation of erosion and damage
- Repair and reinforcement design for damaged piers
- Jacking frame design for temporary support during repairs
- Erosion protection design
- Field reviews during repair installation


Solutions in Action
Related Industrial Projects

Featured Projects
Riser Main Support Structure Rehabilitation and Pipe Design
TULLOCH developed a DN750 cooling-water bypass and structural solution to help a major steel manufacturer reduce the risk of downtime and protect blast furnace operations.


Discuss Your Industrial Rehabilitation Project
Planning an industrial rehabilitation project? Contact our Sault Ste. Marie team to discuss your site, technical requirements and next steps.
