Air Dryer Piping and Supports

Project Overview
Services: Engineering, Mechanical Engineering, Structural Engineering
Sector: Industrial & Manufacturing
Project Description
A major steel manufacturer introduced a new air-dryer system within its Cold Mill to improve compressed-air quality. The upgrade included two 19 m³ air receivers, a new filter, and a dryer integrated into the existing DN200 compressed-air system.
TULLOCH reviewed existing reference information and developed a coordinated 3D model of the surrounding structure, piping, and equipment. The model was used to refine equipment placement, anchorage requirements, pipe routing, connections, and support locations before the final design was issued.
The completed package brought the mechanical and structural requirements together into coordinated construction documentation, including equipment layouts, P&IDs, support details, spool drawings, and foundation design for the new air receivers.
Scope of Services
- Review of existing reference drawings and 3D modelling
- Equipment layout and anchorage design
- DN200 compressed-air piping integration and routing
- Pipe support and connection design
- Slab-on-grade foundation design for two 19 m³ air receivers
- General Arrangement drawings with bill of materials
- P&IDs, support details, and spool drawings
- QA/QC and final construction drawing package


Solutions in Action
Related Industrial Projects

Featured Projects
Ammonia Piping and Pumps for Storage Tank Conversion
TULLOCH designed approximately 650 m of process piping, pumping, loading, heat tracing, and structural supports for an industrial ammonia liquor storage conversion.


Discuss Your Industrial Piping Project
Planning an industrial piping project? Contact our Sault Ste. Marie team to discuss your site, technical requirements and next steps.