Billy Bishop Airport Refurbishment

Project Overview
Location: Toronto, ON
Client: Soletanche Bachy Canada
Services: Geomatics, Geomatics Engineering
Sector: Transportation
Project Description
TULLOCH supported Soletanche Bachy Canada on rehabilitation of approximately 150 m of sheet-pile dock wall at Billy Bishop Toronto City Airport. The project replaced sheet piles along part of the island dock wall in a marine environment.
TULLOCH established project control, completed preliminary topographic surveys, provided staged construction layout and checks, and documented final as-built conditions to support installation, closeout, and future reference.
Scope of Services
- Primary construction control network
- Preliminary topographic surveys
- Layout and as-built surveys of dock-wall components
- Final as-built survey of completed works