Fort Creek Aqueduct

Location: Sault Ste. Marie, ON
Discipline: Environmental, Engineering, Construction Administration
Markets: Municipal Infrastructure

Completed: 2020

Creek Aqueduct is a key component of Sault Ste. Marie’s drainage infrastructure. It had reached the end of its service life. A hydraulic assessment revealed that a new design was required to increase its capacity to accommodate current design standards for storms and to minimize area flooding.

The City of Sault Ste. Marie retained TULLOCH to complete a Class Environmental Assessment, preliminary and detailed design recommendations, preparation of the tender documents, and inspection and contract administration during construction of the work.