Oxtongue Lake Bridge Project
Projects

Oxtongue Lake Bridge Replacement

2012
MTO
This project consisted of: Civil Engineering, Contract Administration, Engineers

TULLOCH is recognized as a leader in the Contract Administration and support services for the construction industry. We have built an impressive portfolio providing construction management services for all levels of government and private industry. In 2012, TULLOCH was retained for contract administration services for the Oxtongue Lake bridge replacement. The bridge replacement, located on Highway 60 just 10 km west of Algonquin Park, was completed in November of 2013. The project schedule included the installation of a Temporary Modular Bridge (TMB) before beginning the removal of the existing structure. The piles for the temporary bridge were driven from a barge using a drop hammer pile driver.